[Skip to content]

News by Category:
Caterpillar G&Z 295 X 110 BannerVisionLink 2014 295 x 110CONEXPO 2014 Trimble Banner 295 x 110Lindsay Logo 295 x 110PPRS Paris 2015 Banner 295 x 110

Daily Video

Click here to see all Daily News videos
Video Sponsor  Trimble
28 January 2014

New Allu 3D positioning system for mass stabilisation

First publishedCONEXPO-CON/AGG
2014
Preview News
The new ALLU 3D positioning system at Conexpo is made up of four modules: computer unit with software; touch-screen; base station and GPS antennas utilising GPS signals.

The Finnish company says the new system eases the mixing work and at the same time ensures homogenous mixing results and accurate binder feeding on each cell/block in mass stabilisation.

The positioning system can be mounted on every old and new ALLU stabilisation system, a process which is carried out by feeding dry powder such as binder from a pressure feeder via a hose to the ALLU PMX mixing head mounted on an excavator. The mixing head can then be positioned to the right place on the work area with the help of the new system.
Stand G-2109
VisionLink 2014 295 x 110Caterpillar Guntert & Zimmermann banner 172x71Lindsay Logo 295 x 110PPRS Paris 2015 Banner 295 x 110CONEXPO 2014 Trimble Banner 295 x 110