February 8, 2018
UltraScape Flowpoint has been used at three new roundabouts as part of the €11 million Juuliku junction and section upgrade near Tallinn.
The 9km project involved reconstructing areas of the road network as well as introducing a new 3.4km section of road, two bridges and viaducts and a two-level interchange. An additional three roundabouts were built with natural stone to assist with the flow of cars and trucks. Maanteeamet (the Estonian Road Administration) required a grout that would be durable and cou