May 14, 2012 Healthy bidding for Poland's highway construction Bidding is healthy for a section of dual carriageway in Poland linking Kurow with Lublin. The section is 60km long and has been divided by the Polish General Directorate for National Roads and Motorways (GDDKiA) into five separate bids.
March 2, 2012 Polish road dispute Questions are being asked in Poland over the poor performance of the recently paved S8 dual carriageway, close to capital Warsaw.