The nearly US$500,000 project involves the replacement of corroded bolts and steel members and steel plates to the bridge that connects the islands of Biliran and Leyte.
The temporary bridges made from disused railway flat cars are being supplied and installed by Innovative Bridge Company based in the US state of Mississippi.
The winner and finalists were announced during the Ten Steps to 2030 for Safer Road Infrastructure Side Event of the 4th Global Ministerial Conference on Road Safety in Marrakech, Morocco.
The five-year deal was signed during the recent Ten Steps to 2030 for Safer Road Infrastructure Side Event of the recent 4th Global Ministerial Conference on Road Safety underway in Marrakech, Morrocco.