Skip to main content

Mexico's new RCC concrete road

CEMEX is supplying a special grade of concrete for use on a busy logistics centre in Mexico. The order has been for 21,500m3 of roller compacted concrete (RCC) to pave all of the roads for the new terminal of ALA Transportes, a division of Grupo Transportes de Monterrey (GTM) - the largest trucking company in Mexico. The trucking firm needed a tough and durable concrete grade to be able to cope with the loads exerted by the movements of around 400 heavily laden trailers/day at the facility.
November 9, 2017 Read time: 2 mins
CEMEX has supplied a special material grade for use in the truck logistics facility in Mexico

3016 CEMEX is supplying a special grade of concrete for use on a busy logistics centre in Mexico.

The order has been for 21,500m3 of roller compacted concrete (RCC) to pave all of the roads for the new terminal of ALA Transportes, a division of Grupo Transportes de Monterrey (GTM) - the largest trucking company in Mexico. The trucking firm needed a tough and durable concrete grade to be able to cope with the loads exerted by the movements of around 400 heavily laden trailers/day at the facility.

Occupying a site covering 15ha at Nuevo Laredo in northern Mexico, the project required a solution able to cope with the 400 trailers/day, accounting for total loads of 14,000tonnes. The client was also keen to benefit from long-term savings on site repairs and maintenance during the lifespan of the pavement.

CEMEX decided that an RCC solution would best meet the challenge. This CEMEX product enables the paving of roads subject to heavy traffic such as industrial parks, working yards, and slow traffic lanes.

The project included the use of hydraulic concrete exclusively for the main road inside the terminal. However, to maximise the benefit of the product’s features, RCC was placed in all of the roads, providing a longer lifespan, faster opening of the road to vehicles, and reduced maintenance costs.

For the first stage of this project, CEMEX delivered a comprehensive turnkey offering of 65,000m2 of RCC placed through a high-intensity paver, together with 50,000tonnes of aggregates for the coating of the hydraulic base.

The second phase of this project is planned to be developed over the coming months, and CEMEX expects to supply an additional 40,000m2 or so of RCC and around 30,000tonnes of aggregates.Additionally, ALA Transportes announced the construction of a work yard for the new terminal in Queretaro, Mexico, which will comprise 15ha of land.

For more information on companies in this article

Related Content

  • Concrete highway linking Mexico with US
    March 17, 2016
    A new concrete surface has been constructed along the busy Monterrey-Nuevo Laredo highway in Mexico. This route is of prime importance both for Mexico and its neighbour, the US, as it is the main export-import route between the two countries. Located in northeast Mexico, the Monterrey-Nuevo Laredo highway connects Mexico with the state of Texas in the United States. The route carries 52% of Mexico’s imports and exports and is crucial to the country’s economy, as well as for that of the US. CEMEX Mexic
  • RCC road paving technology growing in demand
    November 13, 2014
    US contractor Robert Smith based in Chattanooga has long experience in the asphalt paving market but has recently added roller compacted concrete (RCC) to its paving portfolio. This heavy-duty cement mix can be poured as quickly as asphalt and the company has now developed its skills at laying large areas of RCC in just a few days for its industrial client base. Demand has grown and RCC work now accounts for over 90% of the firm’s workload, which it carries out using a Volvo CE paver.
  • Cement supply for Mexico City
    August 15, 2018
    CEMEX has supplied over 44,000m3 of concrete for road pavement and infrastructure development of the La Mexicana Park area in Mexico City. The former mine is located in the city’s Santa Fe area, which has been reclaimed as a public space and now attracts more than 20,000 people/week. Working under a turnkey project scheme, CEMEX paved the new four-lane roads surrounding the park - Luis Barragan and Paseo de los Arquitectos avenues - an area totaling 35,000m2 with 3km of development. To meet the necessary
  • LafargeHolcim delivers Algeria concrete road solution
    May 14, 2018
    In Algeria, LafargeHolcim has introduced roller compacted concrete (RCC) for the first time in the country to renovate the RN45 road, with reduced costs, construction time and increased durability - *Nicolas Miravalls. Heavy traffic on a road stretch in northern Algeria has resulted in the need for rebuilding of the link, making it better able to cope with demand. In Algeria’s Msila region, the RN 45 road carries over 700 heavy load trucks/day, 365 days/year and required a major re-construction. In 2017, La